Plumbing Installation in Vienna
Plumbing installation covers the planning and installation of bathroom and toilet fixtures, faucets, and supply and drain lines. ReinRohr handles your entire bathroom renovation: from consultation, through tiling and fixtures, to final sign-off – on schedule and at a fixed price.
What Plumbing Installation Includes
Bathroom Renovation
Complete renovation of your bathroom including tiling, fixtures, and lighting – planned and executed from a single source.
Toilet Installation
New installation and replacement of wall-mounted or floor-standing toilets, including cisterns, connection to supply and drain lines, and proper sealing.
Fixtures
Installation of sink, shower, and bathtub fixtures from leading manufacturers, matched to your existing or new bathroom fittings.
Accessible Bathrooms
Walk-in showers, grab bars, and senior-friendly conversions for a safe and comfortable bathroom at any age.
How Your Bathroom Renovation Proceeds
Site Visit & Consultation
We inspect your bathroom on site, discuss your wishes, and show you the design options available.
Planning & Fixed-Price Quote
You receive a detailed plan covering tiles, fixtures, and faucets, plus a transparent fixed-price quote.
Renovation & Installation
Our team carries out demolition, structural work, tiling, and installation of all fixtures to a professional standard.
Final Cleaning & Sign-Off
Once finished, we clean the site and hand over the completed bathroom during a joint walkthrough.
Frequently Asked Questions About Plumbing Installation
How long does a complete bathroom renovation take?
A full bathroom renovation in a Vienna period building or new-build apartment typically takes two to three weeks, depending on the size and scope of the work, from demolition through final cleaning. For a straightforward like-for-like replacement without changes to the floor plan, the bathroom is often usable again after just one week. Our fixed-price quote includes a binding timeline.
Can I still use the toilet during a bathroom renovation?
During a complete renovation, the bathroom is unusable for several days because pipes, tiling, and fixtures are all being worked on at the same time. On request, we can arrange a temporary toilet solution or schedule the work so that at least one toilet remains available in the household for short periods. Let us know during planning and we'll factor it into the construction schedule.
Do you also do accessible bathroom conversions?
Yes, we plan and install walk-in showers, slip-resistant flooring, grab bars, and wheelchair-accessible vanities for a safe, senior-friendly bathroom. On request, we can also advise you on subsidies for accessible housing and coordinate the conversion with your care provider or housing consultant.
Designer bathroom with double vanity
Modern bathroom renovation with double vanity, LED lighting and integrated washer niche – photographed from left and right.